< Back to blog

M1 Motorway approaches 60 Posted On 31 August 2018

The M1 is one of Britain’s oldest motorways, having now been open for 60 years

 

The M1 was built in four phases; the first section was completed in 1959 between Watford and Crick/Rugby and is now known as Junction 5 and Junction 18. Between 1977 and 1999, a connection between Brent Cross and Page Street was created and the M1 section north of the M62 was reconstructed linking Leeds to Hook Moor.

The whole motorway was officially completed in 1999 and cost roughly £26 million, which would be around £400 million in today’s currency. It was the greatest single road project that had ever been attempted in Britain. And of course, it succeeded!

The M1 is 193 miles long, allowing travel between London and Leeds in just over three and a half hours. Before the M1 was built, this journey would have taken around seven hours and cost three times as much in fuel.

When the M1 was designed, it was predicted that approximately 20,000 cars would use it per day. However, more than 140,000 cars now use it daily; and with plans to extend the motorway, this number will grow.

According to the AA, when the M1 was first opened, there was less traffic than there is today, although there was no speed limit on any stretch of the M1 at all. This meant that overheating and blown engines were the most common call-outs. There was also no central reservation, crash barriers or lighting. Due to this, the year the M1 opened the road fatalities went up to 6,520 from 5,970 the previous year. There has been speculation that the reasoning for this could be related to the new motorway not having the safety measures that are in place today. It wasn’t until around 1973 that an announcement came out that safety barriers would be put in place following the lighting which would be completed during that same year.

Watford Gap services opened its doors the same day that the M1 was officially opened, so they are the oldest service stations in the UK. They were original run by a company called Blue Boar, and are now run by Roadchef, and have been since 1995. Little Chef also opened in Reading and have grown from one restaurant with 11 seats to 78 restaurants between Scotland and Cornwall.

Going from no speed limits when it first opened, to the present day, parts of the M1 now operate on a new technology-based speed limit system. There is a control room at the East Midlands Regional Control Centre where they can control speed limits depending on what is happening on the road at the time. During high congestion, they can drop the advisory speed limit to help aid driver’s safety and traffic flow. They can also control the variable message signs to warn drivers of upcoming hazards and traffic information.

The M1 has become a huge part of travelling in the UK, with work still being done to expand it.

< Back to blog

Connect with us

Recent Posts

Our first line of defence

To stand the best chance of beating harmful viruses, now’s the time to start strengthening your immune system  Every minute of our lives, we are bombarded by viruses, fungi and bacteria that can make us ill and, simplistically, it is the job of our internal network to sift through the trillions of micro-organisms in the body, working out which are …

Read more...

DIY knowhow… Tiling

With many of us spending more time at home, why not try some DIY jobs that may be bigger than you would usually take on? The great thing about doing it yourself, is the pride you get after finishing the job. But remember, always consult a professional if the task at hand goes beyond your capabilities or involves electrics or gas. Tiling a …

Read more...

Get your property market-ready 

With the property market open, now is the perfect time to get your property “market-ready.”   Tidy the Garden The garden is a huge selling point for most properties on the market. With the warmer weather having arrived, now is the perfect time to get into your garden to complete quick and simple jobs to make your property more sellable and …

Read more...

Government Update – Lockdown measures review

Yesterday evening, the Prime Minister, Boris Johnson led the daily news briefing with an update on the lockdown rules. Mr Johnson confirmed that the five tests that needed to have been met during lockdown have now been met. The five tests included: 1. Making sure the NHS could cope. 2. A sustained fall in the …

Read more...

Non-essential retailers to reopen

Boris Johnson announced on Monday that all non-essential retailers will be allowed to reopen in England from the 15th June. Retailers will have to adhere to new guidelines to protect their workers and their customers, and it is ‘contingent on progress in the fight against coronavirus.’ This goes alongside outdoor markets and car showrooms which …

Read more...